You don't have javascript enabled. Good luck with that.
Pencarian
Ini Rekayasa Lalin Saat Revitalisasi JPO Polda

Here is Traffic Engineering During Polda Metro Jaya JPO Revitalization

Due to Polda Metro Jaya JPO revitalization, traffic engineering will be applied at Jalan Jenderal Sudirman on December 6, 2018. It is only temporary.

Drivers must comply with the signs and follow the officer instructions in the field, and prioritize safety

Similar policy will also be applied during JPO girder installation on the east side on December 6, starting at 11 PM-4.30 AM. Eventually vehicles coming from Slipi, Harmoni and Kuningan toward Senayan will be rerouted to Jalan Gatot Subroto-u-turn at Mampang intersection-Kuningan-turn left to SCBD or Jalan Gerbang Pemuda, etc.

Then for west side, it is also slated to be applied on December 7 at 11 PM-4.30 AM. Vehicles coming from Blok M toward Harmoni and Slipi will be rerouted to Jalan Pintu Gelora 1-Jalan Asia Afrika-Jalan Gerbang Pemuda–Jalan Gatot Subroto–Semanggi–Jalan Jenderal Sudirman, etc. 

S. Jakarta Bina Marga Builds JPO on Gang Rusa

Jakarta Transportation Dept. Acting Head, Sigit Wijatmoko stated that the work is done at night until dawn in a bid to minimize traffic jam.

"Even though it's done at night, we still urge drivers to adjust and avoid areas affected by traffic engineering," he expressed, Monday (12/3).

During traffic engineering, his side will also deploy personnel in the field to help direct motorists to alternative routes.

"Drivers must comply with the signs and follow the officer instructions in the field, and prioritize safety," he stated.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1044 personFolmer
  2. Posyandu-Posbindu Services Reach 1,600 Seniors and Toddlers in Utan Panjang

    access_time07-04-2026 remove_red_eye838 personFolmer
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye815 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye791 personTiyo Surya Sakti
  5. Palmeriam Market Adopts QRIS Digital Payment System

    access_time08-04-2026 remove_red_eye691 personNurito